Case study

Aion Steel structure shelter

From the client's visit to Slimtech and project meetings to a steel-frame shelter on site.

Steel frame of a large shelter going up, with boom lifts
Steel structure shelterIndustrial
Product
Steel structure shelter โครงสร้างเหล็ก
Sector
Industrial
Location
[PLACEHOLDER: location]
Media
4 photos · 1 video
01

Photos

4 photos
  • The Aion team visiting the Slimtech office
    The Aion team visiting the Slimtech office
  • Project meeting in the Slimtech meeting room
    Project meeting in the Slimtech meeting room
  • Steel frame of a large shelter going up, with boom lifts
    Steel frame of a large shelter going up, with boom lifts
  • Inside the shelter frame with the roof panels fitted
    Inside the shelter frame with the roof panels fitted
02

Video

1 video
Video: inside the Aion shelter during installation (29 seconds)
+All projects

Planning a project?

We work with interior designers, architects and building teams: send us drawings or window sizes and we will recommend the right curtains, blinds or awnings, then make and install them.

Start a project
  • Sri Sawat Power Building
  • Government Housing Bank
  • The Royal Sands Koh Rong
  • Neurological Institute of Thailand
  • TMB
  • KMUTT
  • Thailand Institute of Justice
  • Public Relations Department
  • Chitralada School
  • Royal Thai Navy
  • Unico Grande Golf Course
  • Aion
  • WHA Corporation
  • APL Logistics
  • Best Logistic Tech