
Case study
Steel structures and site work Steel structures, louvres and site work
Steel-roof shelters, louvre panels, foundations, fencing and fire-pipe work on industrial sites.

- Product
- Steel structures, louvres and site work งานโครงสร้างเหล็กและงานหน้างาน
- Sector
- Industrial sites
- Location
- [PLACEHOLDER: location]
- Media
- 12 photos
Photos
12 photos
Workers in safety vests fitting precast concrete wall panels along a building 
Inside a finished open-sided shelter with a steel roof 
Steel-roof building with red louvre panels and glass sides 
Steel roof frame on columns with a low wall, under construction 
Wide view of the steel-roof structure under construction 
Workers on scaffolding fitting red louvre panels to a steel frame 
Inside the shelter while red louvre panels are fitted 
Excavator digging beside a factory wall while staff supervise 
Fire water pipe with a flexible coupling installed beside a building 
Steel fence posts set along a site boundary next to a pond 
Foundation rebar laid out across a cleared site 
Surveyor checking levels on a site with rebar in the ground
More projects
All projectsPlanning a project?
We work with interior designers, architects and building teams: send us drawings or window sizes and we will recommend the right curtains, blinds or awnings, then make and install them.
Start a project- Sri Sawat Power Building
- Government Housing Bank
- The Royal Sands Koh Rong
- Neurological Institute of Thailand
- TMB
- KMUTT
- Thailand Institute of Justice
- Public Relations Department
- Chitralada School
- Royal Thai Navy
- Unico Grande Golf Course
- Aion
- WHA Corporation
- APL Logistics
- Best Logistic Tech
