
Case study
APL Logistics Ramps, paving, kerbs and dock work
Steel ramps with guard rails, new paving, kerbs, steps and loading-dock work at the warehouse.

- Product
- Ramps, paving, kerbs and dock work งานทางลาด ทางเท้า และงานท่าเทียบรถ
- Sector
- Logistics warehouse
- Location
- [PLACEHOLDER: location]
- Media
- 22 photos
Photos
22 photos
Finished steel ramp with yellow and black guard rails beside a guard booth 
Excavator breaking up paving inside a fenced-off work area 
Excavator and workers digging along the warehouse 
APL Logistics office building 
Laying rebar mesh for a new concrete slab 
Finished kerb and paving along the warehouse 
New steps at a warehouse entrance 
Office entrance with new steps and a painted kerb 
Loading yard with the work area fenced off 
Excavator removing old paving 
Broken concrete beside the loading bay 
Soil and rubble during excavation 
Work along the row of loading docks 
Levelled ground ready for concrete 
Excavator digging a trench along the dock wall 
Trench dug beside a downpipe 
Worker in the trench beside the dock wall 
Finished concrete area beside a loading dock 
Old ramp being broken up 
New ramp base with guard rails 
Forklift placing a steel dock plate 
Finished ramp with guard rails at a loading door
More projects
All projectsPlanning a project?
We work with interior designers, architects and building teams: send us drawings or window sizes and we will recommend the right curtains, blinds or awnings, then make and install them.
Start a project- Sri Sawat Power Building
- Government Housing Bank
- The Royal Sands Koh Rong
- Neurological Institute of Thailand
- TMB
- KMUTT
- Thailand Institute of Justice
- Public Relations Department
- Chitralada School
- Royal Thai Navy
- Unico Grande Golf Course
- Aion
- WHA Corporation
- APL Logistics
- Best Logistic Tech
